CDM for the Principal Designer – Including a detailed review of suitable Fire Safety precautions and design measures during construction with case examples
Nick Southall MRICS, MIFireE

On Wednesday 12 August 2020 from 12.30pm to 1.30pm
Via Zoom

Download presentation here:  CDM for the Principal Designer

LBC are pleased to invite you to our free 1-hour CPD session covering CDM for the Principal Designer – Including a detailed review of suitable Fire Safety precautions and design measures during construction (with case examples) with Nick Southall MRICS, MIFireE

Provisions still cause confusion for some design team members in terms of who does what and the extent of detailing proportionate to the project size and complexity.

In this presentation we will endeavour to provide a simple handy guide which should give confidence to design team members in terms of what is expected from them.

We will particularly look at suitable Fire safety measures during construction that should be detailed in the Principal Designers pre-construction information pack.

Informal and friendly, the session will start at 12.30pm and last about an hour.

CPD certificates are issued following each session.

To register please click the link below:-

https://www.eventbrite.co.uk/e/cdm-for-the-principal-designer-tickets-115044806112

An invitation to join the meeting will be emailed to you an hour before the meeting starts.  Please check your spam folders in case the email doesn’t go directly to your inbox.

Download our Guidelines for Zoom Network Meetings.

If you haven’t used Zoom before please check with your IT Team to ensure you are able to access the software or view the Zoom website troubleshooting section.

https://support.zoom.us/hc/en-us/sections/200305593-Troubleshooting

Please contact Maria Apps at maria@londonbuildingcontrol.co.uk or call 01392 240770 if you have any queries.